Abstract
This case study features a referendum on a controversial viaduct in Antwerp, Belgium. The construction of this viaduct was highly troubled and costly from the beginning, attracting heavy criticism from multiple groups. A referendum ultimately rejected plans to build the unpopular bridge, instead replacing it with a series of tunnels.